Ian Smith
BC Bathroom
outline

start01 start2

On some occasions a total refit is called for, on wooden floors if ceramic tiling is to be carried out it is important to ensure that the floor is stable to avoid damage to the tile or grouting. This can be achived by overlaying the floor with marine ply at least 13mm thick.

start4start3

With the floor stablised and any nesasary repairs made to the walls the floor can be tiled, a job made much simpler by the absence of the bathroom suite.

strat6

Careful planning by our experianced craftsmen ensures that every contract is finished to a standard second to none.

start7start7

With the tiling compleated and grouted it only remins to fit & plumb in the bathroom suite and add any special finishing touches.

finish01finish02

With the finishing touches applied the bathroom is as new and ready for use.

All work is guaranteed and on the rare occasions when there are problems we are happy to send out trained staff to sort them out promptly and professionaly with minimal fuss or inconveniance.

finished

Home